A MCAQD authorized Arizona Dust Control permit and Dust Control Plan must be on site prior to conducting any Dust Generating Operation.

Daily Dust Control inspections are required to be conducted and logged.

Dirt Track out/ Carry out may not exceed more than 25 cumulative feet on any construction project. Clean it up Immediately!

Site construction entrances must be at a minimum a total of 30 feet wide, by, 50 feet long, by 3 inches deep.

Comprehensive Dust control Coordinator certification is required on all projects that disturb 5 or more acres of land. MCAQD has required that this certification be obtained by June 30, 2008.

Basic Dust Control Coordinator certification is required on all projects that disturb between 1 and 5 acres. MCAQD has required that this certification be obtained by December 31, 2008.
 

 